Here’s the planned work for the week of September 3 for East Washington Avenue (Second Street to Marquette Street)

Stage 5 – Work in the median from 3rd to 6th Street:

  • Topsoil and landscaping work
  • Electrical work in the median

Stage 4 – Reconstruction of the inbound lanes from 6th Street to Marquette Street:

  • Removal of existing roadway and grading
  • Water main construction
  • Sanitary sewer construction
  • Bridge work for the new pedestrian structure
  • Demolition of existing roadway bridge
  • Work by private utility companies

See Metro website or project website for more information - “Metro Transit During Construction� for details. There will be no parking on East Washington Avenue in the construction zone. Alternative Routes are I90/94 and the beltline. The field office phone is (608) 242-7305, fax is (608) 242-7317. The website will be updated: http://www.eastwashington.org/Tom Riffle
Facilities Operations Manager