Here’s the planned work for the week of October 22 for East Washington Avenue (Second Street to Marquette Street):

6th Street to Johnson Street:

  • Electrical work and signal work
  • North Street will be closed on Tuesday 10/23 for asphalt paving
  • Asphalt pavement on 7th Street, North Street and Pawling Street
  • Topsoil and sod
  • Pavement Marking
  • Electrical work

Johnson Street to McCormick Street:

  • Johnson Street will be closed on Wednesday 10/24 thru Saturday 10/27 for concrete paving
  • Trimming for concrete and concrete paving East Washington Avenue and Johnson Street
  • Bridge work for the new pedestrian structure
  • Bridge work for the new roadway bridge

See Metro website or project website for more information - “Metro Transit During Construction� for details. There will be no parking on East Washington Avenue in the construction zone. Alternative Routes are I90/94 and the beltline. The field office phone is (608) 242-7305, fax is (608) 242-7317. The website will be updated: http://www.eastwashington.org/